Frost line depth in City and Borough of Juneau, Alaska
Frost reaches about 44 inches in typical soil across City and Borough of Juneau. Codes in this climate commonly set footing depth at 36 to 54 inches.
Deep frostFrost depth by soil type
| Soil type | Est. frost depth |
|---|---|
| Sand / gravel (drains well) | 55″ |
| Silt / loam (typical yard soil) | 44″ |
| Clay (holds water) | 38″ |
County average. Methodology.
Verify before you dig. These are climate-based estimates. The legally required frost depth is the figure your building department publishes in its IRC Table R301.2 (climatic and geographic design criteria). Call the City and Borough of Juneau building or permitting office in Alaska and call 811 before digging.
Frost depth by ZIP code in City and Borough of Juneau
What this means for your project in City and Borough of Juneau
Deck footings & piers
Footings must bear below the frost line and at least 12″ below undisturbed ground. For planning in this area, budget for holes around 54″ deep until your permit office confirms the exact figure.
Fence posts
Set posts at least one-third of their above-ground height. Where frost heave is a problem, carry concrete footings below the frost line (about 44″ here in typical soil) and bell or taper the bottom.
Water & irrigation lines
Bury supply lines below the frost depth. Your water utility or plumbing code sets the minimum cover; in a climate this cold, 4 feet or more is common for service lines.
Slabs & frost-protected foundations
Frost-protected shallow foundations (IRC R403.3) use the 100-year air freezing index — 1,980 °F-days here — to size perimeter insulation, letting footings sit shallower than the frost line.
Weather stations used
| NOAA weather station | Distance | 100-yr AFI |
|---|---|---|
| Juneau Airport, AK | 4 mi | 2,057 |
| Annex Creek, AK | 14 mi | 1,762 |
| Five Finger Light Sta, AK | 81 mi | 932 |
Nearby counties
Common questions
What is the frost line depth in City and Borough of Juneau?
About 44 inches in typical soil, based on NOAA's 100-year air freezing index. Across the county's ZIP codes the estimate runs from 44 to 44 inches.
How deep should footings be in City and Borough of Juneau, Alaska?
Codes in climates like this commonly require 36 to 54 inches. The City and Borough of Juneau building department publishes the required frost depth in its adopted code (IRC Table R301.2).
Does frost depth vary within City and Borough of Juneau?
Very little. Estimates across the county stay within 1 inches. Soil type matters more than location here.